Results tagged “City of Yucaipa. Yucaipa Boulevard Storm Drain project.” from Yucaipa Now

YUCAIPA - Work continued on the Yucaipa Blvd. Storm Drain project at the corner of Yucaipa Blvd. and California Street on Monday.

Chicken Springs Wash Storm Drain and Street Improvements / Yucaipa Boulevard Storm Drain projects include the construction of curb and gutter, sidewalk, asphalt concrete pavement, and storm drain improvements.

The projects also include earth channel grading, placement of grouted rip rap, concrete structures and catch basins, removal of existing storm drain culverts, construction of concrete flood walls/retaining walls, and reconstruction of existing surfaces between Adams Street and Third Street along Yucaipa Boulevard and at the Third and Fourth Street culvert crossings.

The project is underway and is scheduled to be completed April 2009.

About this blog

Bob Otto covers Yucaipa, Calimesa and the San Gorgonio Pass for The Sun. He has worked as a photographer and writer for The Sun, Fontana Herald News, The Hemet News, The Valley Chronicle (Hemet) and the Yucaipa News Mirror during his journalism career. Otto has lived in Yucaipa since 1979. If you have a news tip for Bob E-mail him at bob.otto@inlandnewspapers.com

Yucaipa Photos





Get Yucaipa Now News
Have news alerts sent straight to your email, subscribe here:
Enter your Email here


Preview
Powered by FeedBlitz

Recent Comments

Powered by Movable Type 4.25

Tags

Advertisement