PHOTO: Pauley Pavilion tour

On Tuesday, the media went on a tour of Pauley Pavilion but weren’t allowed to release anything until tonight. Here are some quick shots I took on the walkthrough. For all those interested, John Wooden’s eight-foot statue will be unveiled at 2:30 p.m. Friday.

Facebook Twitter Plusone Digg Reddit Stumbleupon Tumblr Email
  • 9UCLA7

    Thanks for the report & pics, Jack. Can’t wait to see it in person.

  • http://twitter.com/SGVTribPreps Fred J. Robledo

    New commenting system set and ready to go. You can sign on through twitter, facebook, google or remain anonymous by creating a sign name on Disqus, where just like before, all that is required is a sign name and email. The new commenting system is lighting quick, so fast you can have a live chat with another commenter.

  • Ted

    I was thought that the seating for basketball was going to be brought in right up to the court? Was not that one of the main reason for the renovation? Judging by the picture there is still so much room on the end line and one of the side line.

  • Semi-Pro

    Ted, the seats are not fully extended in the photo.

    • Ted

      I know one of the end line always had bleachers that stretch out. The far end line I know has bleacher that extend out. It was always the end line that was closest to the locker room entrance that had that wide chasm with the ugly brown tarp (band usually used to sit on this end) Now does this side have the extension as well? They were lowering the floor to make this happen was what I remember reading.