Storm drain project on Yucaipa Boulevard

| | Comments (0) |

011509-Chicken SpringsLR.jpg

YUCAIPA - Traffic narrowed to one lane on both the east and west bound lanes of Yucaipa Boulevard as the construction crew from Ted Burton Underground, Inc. were busy installing a storm drain as part of the Yucaipa Boulevard storm drain project. The project extends from Adams Street to Third Street and is expected to be completed in March.

Traffic slows to 25 mph in the construction zone and occasionally stops do to the movement of heavy equipment and for safety measures, so expect some delays if driving in the upper part of Yucaipa.

Leave a comment


Type the characters you see in the picture above.

About this blog

Bob Otto covers Yucaipa, Calimesa and the San Gorgonio Pass for The Sun. He has worked as a photographer and writer for The Sun, Fontana Herald News, The Hemet News, The Valley Chronicle (Hemet) and the Yucaipa News Mirror during his journalism career. Otto has lived in Yucaipa since 1979. If you have a news tip for Bob E-mail him at bob.otto@inlandnewspapers.com

Yucaipa Photos





Get Yucaipa Now News
Have news alerts sent straight to your email, subscribe here:
Enter your Email here


Preview
Powered by FeedBlitz

About this Entry

This page contains a single entry by Bob Otto published on January 15, 2009 10:26 AM.

Yucaipa girls soccer strives to keep win streak going was the previous entry in this blog.

Tirella shoots Yucaipa to victory over Carter is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Recent Comments

Powered by Movable Type 4.25

Advertisement